Sunday, September 24, 2006

It's Almost Time

Were completing the drain plumbing and its a bear. After a tough day of barely getting this stuff together its finally done. Time to test drain plumbing. Picture this... since we completely connected all drains to the septic, we had to plug the pipes. Dad grabs this shirt, puts it in a plastic bag and proceeds to shove it into the pipe (this was his bright idea on how to plug the pipes). It was working well, mom can almost see the water at toilet level pipes are almost full no leaks. All of a sudden, the pvc shudders quite strongly too, then whoosh yup, drains work, make-shift plug is on its way to the septic tank hee hee

No comments: